Logo image
The last planner® system and building information modeling in construction execution: From an integrative review to a conceptual model for integration
Journal article   Open access  Peer reviewed

The last planner® system and building information modeling in construction execution: From an integrative review to a conceptual model for integration

Applied Sciences, Vol.10(3), 821
10
23/01/2020
Handle:
https://hdl.handle.net/10863/14122

Abstract

BIM Lean construction Production planning and control Data-driven construction
pdf
The_Last_PlannerR_System_and_Building_Information_6.44 MBDownloadView
Open Access
url
https://www.mdpi.com/2076-3417/10/3/821View

Details

Metrics

7 File views/ downloads
33 Record Views