Logo image
Increasing productivity in ETO construction projects through a lean methodology for demand predictability
Conference proceeding   Peer reviewed

Increasing productivity in ETO construction projects through a lean methodology for demand predictability

Patrick Dallasega, Erwin Rauch, Dominik Matt and Andrea Fronk
Proceedings of the 2015 International Conference on Industrial Engineering and Operations Management, pp.1-11
IEOM 2015 International Conference on Industrial Engineering and Operations Management (Dubai, 03/03/2015 - 05/03/2015)
2015
Handle:
https://hdl.handle.net/10863/28166

Abstract

ETO SME PDCA JIT JIS CONWIP lean construction
url
https://doi.org/10.1109/IEOM.2015.7093734View

Details

Metrics

1 Record Views